factory

Technical details

HARD BIO-WASTE PROCESSING LINE Main equipment and facilities of the plant (100) Hard bio-waste shredding system 101, Garat (3x2m), approx. 3m3, ldbWith steel frame, grids and outlet flange Steel plate structure with 3mm plate 102, Feeder conveyor ldbPower: 380 V, 1,5 kW, length: 8m, width: 600mm With one inlet and one outlet 103, Magnetic selector […]

Technical details Read More »

Technological process

Drying of raw material If the moisture content of the raw material is > 10 %, the raw material must be dried. Drying is important for the production and the quality of the biofuel product, because a moisture content of 14-15 % makes pressing difficult. Cleaning and refining the raw material The feedstock supplied for

Technological process Read More »

Pellet Plant
Scroll to Top